Integrated delivery depends on clear controls for quality, safety, documentation and decision-making. These controls are tailored to each project’s scope and contractual requirements while responsibilities remain traceable at every stage.
01
Quality
A project quality plan covering inspection, acceptance, material approvals, work reviews and controlled closeout of non-conformities.
02
Health, Safety and Environment
Risk assessments, competent personnel, PPE, site organization and controls to stop unsafe work.
03
Document control
Drawings, approvals, reports, tests and handover records that remain traceable.
04
Change control
Assess impact on construction, systems, time, cost and operation before approval.
05
Compliance
Work in accordance with Saudi regulations, contractual requirements and the requirements of relevant authorities.
يعتمد التنفيذ المتكامل على ضوابط واضحة للجودة والسلامة والتوثيق والقرار. وتُكيّف هذه الضوابط مع نطاق كل مشروع ومتطلباته التعاقدية، مع بقاء المسؤوليات قابلة للتتبع في كل مرحلة.
01
الجودة
خطة جودة للمشروع تشمل الفحص والقبول واعتماد المواد ومراجعة الأعمال ومعالجة حالات عدم المطابقة.
02
الصحة والسلامة والبيئة
تقييم المخاطر، وكفاءة العاملين، ومعدات الوقاية، وتنظيم الموقع، وإيقاف أي عمل غير آمن.
03
إدارة الوثائق
مخططات واعتمادات وتقارير واختبارات وسجلات تسليم يمكن الرجوع إليها.
04
ضبط التغيير
تقييم أثر أي تغيير على البناء والأنظمة والوقت والتكلفة والتشغيل قبل اعتماده.
05
الامتثال
العمل وفق الأنظمة السعودية والاشتراطات التعاقدية ومتطلبات الجهات المختصة.